Back to Cases
Leak Detection

Inner Mongolia Heap-Leach Pad Leak Detection

Inner Mongolia, China2023
62,423
Inspection Area
3
units
Ponds Tested
Double
HDPE
Liner Structure
Arc + Dual-Electrode
Methods

Background

A non-ferrous heap-leach facility — overall lined area of 525,339 m², comprising leach pad, intermediate-, pregnant- and emergency-solution ponds. This campaign covered the pregnant-, intermediate- and emergency-solution ponds (62,423 m² total) on a double-composite liner.

Challenge

Verifying construction quality of the lower HDPE while also confirming overall integrity of the upper HDPE — beneath a gravel protection layer — across large pond areas, requiring careful coordination of inspection methods and on-site logistics.

Solution

Lower HDPE inspected by arc-method to identify surface defects; upper HDPE assessed by dual-electrode method after gravel placement. The complementary pairing covered both construction QA and post-cover integrity.

Results

All identified defects promptly repaired by the contractor

Validated the combined arc + dual-electrode workflow over large pond areas

Secured operational safety of pregnant-, intermediate- and emergency-solution ponds

Provided reliable engineering support for non-ferrous heap-leach pollution control

Need a Similar Solution?

Contact our technical team for a customized detection and monitoring solution.

Get a Quote